Solar Panel System was installed during the year 2013 as the college was subject to frequent power cuts, thereby posing a constraint to the functioning of labs and conducive environment for students.
It generates 5 KW. Such an initiative on the part of the management has enabled uninterrupted power supply to the advantage of the students.